by Amy Self | Jan 24, 2020
 In 2014, Ancon Construction and JPR were given the opportunity to provide professional and construction services for the South Bend Cubs Performance Center. This was an exciting project to work on with a challenging schedule. Starting at the end of the baseball season, this project needed to be complete by April 1 – before the beginning of the next season – so the South Bend Cubs could be ready for opening day on April 9.
The project was fast tracked which required a foundation release from the State of Indiana prior to having a full set of construction documents. Throughout the project there were minor changes to the program along with several changes to the shell of the building. This affected both the structural design and detailing; however, the client was very helpful with decisions that needed to be made by always keeping in mind the April 1 deadline.
The South Bend Cubs Performance Center was constructed utilizing a pre-engineered building structure with a brick and metal panel facade. It houses 6 batting cages, along with a weight room, office, and concessions. Additionally, it has a great view of the stadium from the mezzanine level and a walkout patio on the west side of the facility.
“Ancon and crew were great to work with. As always, Ancon came through despite the short time frame.”
Joe Hart, President South Bend Cubs
by Amy Self | Jan 23, 2020
Ancon designed and built a new 5,558-square-foot, two-story dentist office for Aegis Dental Group. Ancon used the Design-Build delivery method to complete this project. The two-story lobby features numerous seating areas with a fireplace, coffee bar, and self-serve check-in kiosks. The architectural elements
include a mass timber roof structure with cladded ceilings and floor-to-ceiling windows.
Programmatic Spaces:
The new building was designed to accommodate various programmatic spaces, including:
by Amy Self | Jan 12, 2019
In 2019, Ancon Construction designed and constructed a 1,144-square-foot building addition onto the west side of the existing building located at 310 E. University Drive in Granger, Indiana. The addition included storage, a waiting area, two restrooms, workstations, along with office space and two exam rooms.
​
by Amy Self | Dec 14, 2018
Located inside the Historic LaSalle Building in downtown South Bend, The Hideaway was a local speakeasy bar. Ancon Construction’s Design-Build team completely renovated the space under the watchful eye of the Historic Preservation Commission. While completing the renovation Ancon used period-accurate woodworking methods and stains. While demoing the old bar, we found old beer bottle caps and a war bond. The entire project was brought back to life while honoring its historic past.