by Amy Self | Sep 30, 2021
Ancon Construction utilized the Design-Build delivery method to construct three (3) new additions to an existing production building for Heartland RV. The 34,000 square feet of production floor allowed Heartland RV to increase its daily RV output. The existing building could not be shut down, and Ancon constructed the three (3) building additions without losing one hour of production for our client. We were able to keep production flow moving forward during construction by closely coordinating our schedule with the facility manager and completing milestone phases, like power transfer, over the weekend to avoid production shutdown.
by Amy Self | Aug 27, 2021
Lippert Plant 19 is a 27,500 square foot Metal Building addition to their current powder-coat line. The addition had a “roof overbuild” that extended onto the existing structure. Within the new structure, we had to build a 16’x60’x3’-6” deep pit with heavy steel embeds for the blast booth portion of the powder-coat process. In addition to the main structure, we built a new 2,000 square foot structure to the north side of the existing structure with finished space that included managerial offices, employee breakroom, new bathrooms, and a new employee breakroom.
by Amy Self | Aug 27, 2021
Imagineering is a 15,000 square foot building addition to their existing facility in South Bend, Indiana. Five thousand square feet is two-story office space and 10,000 square feet of production and storage areas. The office expansion features an employee training room, an administrative office area, and several open office pods organized around team departments. Also included in the project were drainage improvements, additional parking areas, and resurfacing of existing parking areas. The exterior façade features a pattern of windows and vibrant colored metal panels – setting a modern tone for the front portion of the building.
by Amy Self | Aug 21, 2021
In 2017, Ancon Construction designed and built a new addition for Bennington Marine in Elkhart, IN. The 57,500 square foot addition allowed Bennington to increase production from 50 boats to 55 boats a day. Included in the addition were a new R & D space, added production space, and employee breakroom. The addition was completed without losing one hour of production time. Coordination with the facility manager and timing of milestone phases of the project allowed the existing building to continue production with no shutdown throughout the entire construction phase.
by Amy Self | Feb 16, 2021
Over 1.2 million sq. ft. Butler Pre-engineered building designed and constructed in phases by Ancon Construction.
•Single largest addition exceeded 400,000 square feet.
•Ancon’s Building Services division provides maintenance and repair services.
•Steel fabricating, finishing, warehousing and distribution.