Overview
Ancon Construction performed exterior renovations to Station Number Five in 2001. The original station was built in the 1960s. Ancon used the Design-Build building delivery method to complete this project.
Scope of project included:
-
-
Design and construct a new metal roof system at station #5, 4,500 square feet.
-
Engineering and permits
-
Demolition
-
Butler Roof System
-
Asphalt shingles
-
Installation of vinyl-faced fiberglass in all roof and wall areas
-