We performed an in-depth site plan and engineering analysis to confirm that the existing Basney site would accommodate the new Honda requirements and the City of Mishawaka’s new storm water drainage requirements.
- Ancon’s architects suggested improvements and enhancements to the Honda Plans, managed design meetings, and implemented drawing changes across departments, while still meeting the Honda standard building requirements and the project budget.
- Ancon’s project manager suggested a construction phasing plan that would allow the dealership to remain open and productive while still maintaining the project schedule.
- Negotiated favorable parking, curb cuts, and landscaping requirements with the City of Mishawaka.
- Performed cost-benefit analysis during design meetings, which compared the renovation and addition solution with the teardown and build new solution.
- Evaluated green alternatives for the site, building, geothermal heating, and equipment.
- Implemented an engineered sub-surface storm water retention system to allow maximum use ofthe property for paved parking and vehicle display.
- Provided new energy-saving site lighting fixtures.
- Utilized precast concrete exterior solutions to speed up construction and reduce the project’s impact on the business.
- Coordinated all fixtures, furniture, signage, image and graphics packages.