Basney Honda

Overview

We performed an in-depth site plan and engineering analysis to confirm that the existing Basney site would accommodate the new Honda requirements and the City of Mishawaka’s new storm water drainage requirements.
  • Ancon’s architects suggested improvements and enhancements to the Honda Plans, managed design meetings, and implemented drawing changes across departments, while still meeting the Honda standard building requirements and the project budget.
  • Ancon’s project manager suggested a construction phasing plan that would allow the dealership to remain open and productive while still maintaining the project schedule.
  • Negotiated favorable parking, curb cuts, and landscaping requirements with the City of Mishawaka.
  • Performed cost-benefit analysis during design meetings, which compared the renovation and addition solution with the teardown and build new solution.
  • Evaluated green alternatives for the site, building, geothermal heating, and equipment.
  • Implemented an engineered sub-surface storm water retention system to allow maximum use ofthe  property for paved parking and vehicle display.
  • Provided new energy-saving site lighting fixtures.
  • Utilized precast concrete exterior solutions to speed up construction and reduce the project’s impact on the business.
  • Coordinated all fixtures, furniture, signage, image and graphics packages.

Recommended for You

Burton’s Laundry Elkhart

Burton’s Laundry South Bend

LazyDays RV Service Building

Let's Build

Together

Have a project in mind? Let’s talk about how we can bring it to life.

See What We've Built

Browse real projects and see our work in action.