by Amy Self | Aug 26, 2025
Ancon Construction designed and built a new 6,581-square-foot, two-story dentist office for Aegis Dental Group. Ancon used the Integrated Design-Buildâ„¢ delivery method to complete this project. The two-story lobby features numerous seating areas, a fireplace, a coffee bar, and self-serve check-in kiosks. The architectural elements include a mass timber roof structure with cladded ceilings and floor-to-ceiling windows.
The new building was designed to accommodate various programmatic spaces, including:
- Check-in and check-out areas
- Eight patient rooms for hygiene and exam/procedure care
- Additional space for future expansion
- Sterilization
- Lab
- Break room
- Restrooms
- Consultation office
- Private offices
by Amy Self | Aug 26, 2025
Ancon Construction was hired by a local Jimmy John’s franchisee to design and build their 16th restaurant. The new 1,214-square-foot location is located on Bittersweet Road in Mishawaka, Indiana.
by Amy Self | Jun 26, 2025
The Ice Box Skating Rink project consisted of a 37,000-square-foot pre-engineered metal building (PEMB), paired with a 6,800-square-foot adaptive-reuse renovation, which added modern functionality while preserving the site’s historic character, a former Oliver Plow factory built in 1920.
The expanded facility features a new NHL-sized rink, team locker rooms, spectator seating, and a dynamic lobby with concessions, lounge space, and a pro shop.
Ancon’s Integrated Design-Build™ methodology ensured seamless integration with decades of existing additions, each with varying elevations and materials. Historic columns were creatively repurposed into the new design.
by Amy Self | Jun 3, 2025
Ancon Construction was honored to partner with YMCA Camp Eberhart to breathe new life into Dave’s House, just steps from Corey Lake. Built in 1932 as a memorial to camper David Warner Jr., this beloved wooden structure has been a space for connection and learning for generations. Our team helped preserve the building’s historic legacy by making essential repairs, updating the structure, and adding heating so it can be used year-round. We were proud to be part of this project that blends the past with the future, keeping the spirit of camp alive for decades to come. Watch the ribbon-cutting event for this project